Percentage Refusal PRD Mould Manufacturer,Supplier and Exporter in India
Product Code : TVT-BATE-10349
The Percentage Refusal PRD Mould from Tvet Equipments is a vertically split, corrosion-resistant compaction mould used to prepare bituminous specimens for the Percentage Refusal Density (PRD) test, which assesses the degree of compaction achieved in bituminous pavement. Note: this mould is supplied without hammer, supporting frame, and tamping foot, which must be ordered separately.
How It Works
The bituminous mix specimen is compacted inside the vertically split mould using a vibrating hammer, supporting frame, and tamping foot (supplied separately) until refusal density — the point at which further compaction produces no further increase in density — is reached. The corrosion-resistant platen and split-body design allow the compacted specimen to be extracted cleanly for density measurement.
Technical Specifications
| Parameter | Specification |
|---|---|
| Mould Type | Vertically split, corrosion-resistant platen |
| Dimension | 250 mm x Ø165 mm x 205 mm (H) |
| Approx. Weight | 9 kg |
| Supplied With | Mould only — hammer, supporting frame, and tamping foot ordered separately |
Applications
The Percentage Refusal PRD Mould is used for refusal density testing of bituminous mixtures under BS 598: Part 104, the British Standard method for determining the refusal density of compacted bituminous mixtures, in highway agency laboratories and pavement research institutions assessing long-term compactability of asphalt mixes.
Related Products & Category
Part of Tvet Equipments' Bitumen Asphalt Testing Equipment range, used together with a vibrating hammer and tamping foot to complete the PRD compaction and density testing setup.
Frequently Asked Questions
Q1. What does the PRD test measure?
It measures the refusal density of a compacted bituminous mixture — the maximum density achievable under a specified compactive effort, used to assess how much further a pavement mix could densify under traffic.
Q2. Does the mould include the compaction hammer?
No, the mould is supplied on its own; the hammer, supporting frame, and tamping foot needed to compact the specimen must be ordered separately.
Q3. Why is the mould vertically split?
The split design allows the compacted bituminous specimen to be removed from the mould without damage, preserving the specimen for accurate density measurement.
Request a Quote
For pricing, lead times, or technical specifications on the Percentage Refusal PRD Mould, contact Tvet Equipments for an indicative quote.
